The Produce workflow

Run the climb on a live picture, not last quarter's deck.

Produce is where the Plan of Action becomes the daily reality of a CMC team — instantiated activities, live status, governance meetings, and a timeline that actually moves. The next agenda writes itself from the program, not the inbox.

Timeline · Instantiated activities

Every bar on the timeline is a real activity, owned by a real person.

Summit builds program timelines from instantiated activities — each one drawn from the catalog, scoped to the program, and carrying its own ownership, status, risks, deliverables, and dependencies. Click any bar and the detail drawer opens with the work itself, not a label.

  • Activities instantiated from a structured CMC catalog — no blank cells
  • Detail drawer with status, owner, dates, linked risks, and deliverables
  • Re-sequence and shift dates; downstream activities cascade automatically
  • Milestones, overdue flags, and percent-complete roll up to the program
Execution timeline
Q3 · Q4 · click a bar
Jul
Aug
Sep
Oct
CompleteIn progressWatchMilestone
Activity detail
USP scale-up — 50L
In progress
High effort High risk 2 constraints

Scale-up of the fed-batch process from 5L to 50L. Bracketing DO, pH setpoint, and feed strategy.

Schedule
Aug 14 → Sep 22
Progress62%
Ownership
UnitProcess Development
OwnerA. Ng
InitiativeUSP tech transfer to pilot
Effort
1120h
Cost
$312k
CPPs
3
Risks (2 · 1 high)
  • 18Aggregate formation at peak VCD
  • 9Feed pump calibration drift
Constraints
  • Pilot suite booked Aug 19 – Sep 18 · Facility
  • Single-lot media supply · Material
Deliverables
  • Run protocol v2
  • Tech transfer doc
  • In-process control plan
Dependencies
  • Cell line development
This week's CMC stand-up — auto-built
Suggested
  1. 01
    Forced degradation — HC-CDR3 deamidation
    New high-risk liability bound this week
  2. 02
    USP 50L scale-up status
    Activity slipped 4 days · timeline cascade pending
  3. 03
    Decide: extend stability arm?
    Decision overdue · blocking Eng Run GMP-1
  4. 04
    Resource conflict — analytical chemistry
    2 programs converging on the same week
  5. 05
    Upcoming milestones — next 14 days
    1 milestone at risk · 2 on track
Built from 4 program signalsAccept agenda

Automated agenda building

The next meeting writes itself, from the work that actually matters.

Summit watches the timeline, the risk register, and the decision log in between meetings — and assembles the next agenda from what genuinely needs attention. Slipped activities, new high-risk findings, overdue decisions, upcoming milestones. Your team walks in already aligned on what to talk about.

  • Agenda built from live timeline + risk + decision signals
  • Each item explains why it's there — the signal, not a label
  • Accept the suggestion or customize before you start
  • Decisions and actions captured in the meeting flow back to the work

Everything else in Produce

The execution surface, in one workflow.

Execution Queue

The live list of in-flight activities across every active program — status, owners, due dates.

Live Risk Register

Risks attached to the activities that move them — re-scored as the program changes shape.

Decision Log

Every key decision recorded against the meeting where it was made, with the action items it produced.

Teams & Capacity

Accountabilities and capacity per program — see when the same chemist is on two critical paths.

Execution Dashboard

Per-program cockpit — status band, milestones, decisions pending, overdue activities.

Meeting History

Every governance meeting recorded — agenda, decisions, actions, attendance.

Stop building the deck. Start running the program.

See how Produce would replace your next portfolio review with a live cockpit.